Bathroom / Wet area

Tub-to-Shower Conversion Work and Costs

A tub and shower can share a footprint while needing different drain positions, access and wall details. Confirm those first, then compare enclosure options.

Editorial cover for Tub-to-Shower Conversion Work and Costs, showing a bathroom with a vanity and shower.
Illustration of a bathroom with a vanity and shower.

What matters most

  • Existing tub — 60 × 30 in. (drain 9 in. from short end).
  • Candidate shower — 60 × 30 in. (drain 15 in. from short end).
  • Drain-center change — 6 in. (along one axis only).

Measure the drain from two finished walls

Record the drain center from the side wall and end wall. Do the same for the candidate shower base using the manufacturer’s drawing. The overall dimensions can appear compatible even when the centers differ. Ask whether the current drain and trap can be used and what access is needed to evaluate that.

Put two bases over the same outline

In this example, a 60 × 30 in. tub drains 9 in. from the short end. A 60 × 30 in. shower base shows a 15 in. distance on the same axis. The difference is 6 in. before checking the second dimension. A change that looks small on paper can still need access from below or work on a slab.

Example and comparison
Line itemValueBasis
Existing tub60 × 30 in.Drain 9 in. from short end
Candidate shower60 × 30 in.Drain 15 in. from short end
Drain-center change6 in.Along one axis only
Existing tub: 60 × 30 in.; Candidate shower: 60 × 30 in.; Drain-center change: 6 in..
The table gives the quantities, prices or scope behind this comparison.

Price the entire transition

Have the bid include demolition, floor preparation, base or receptor, wet walls, compatible drain and valve, wall transitions and the enclosure. Verify whether trim, fixtures, shower door and substrate repairs are included. The prefab and tiled shower comparison shows what different product bundles cover. If plumbing must move, ask for an alternate that spells out access and restoration.

YOUR TAKE-HOME RESOURCE

Tub-to-shower pre-bid checklist

Get a print-ready planning worksheet by email. We use your name and email to fulfill your request, not to sign you up for marketing.

Compare written supply and installation terms

Ask who supplies the base and glass, who orders after field measurements and who handles product damage or a wrong-sized component. Confirm the applicable inspection and waterproofing procedure with the installer and local authority. Compare complete installed assemblies against the same level of finish.

  • Drain reference — Record both axes from finished walls.
  • Floor access — Note framed-floor access or slab.
  • Wet area — Specify the base, drain, wall assembly and glass.
  • Approval items — List inspections, documentation and extra work.
Scope checks: drain reference, floor access, wet area, approval items.
Use these four checks to document and review the scope.

Sources and scope notes

We distinguish published references from worked scenarios, which are not verified contractor bids. Review product instructions and local requirements for your own project.

Read how we evaluate cost evidence.