What a Shower Waterproofing Quote Must Include
Ask for the complete water-control assembly in writing and agree how it will be documented before tile covers it.

What matters most
- Walls — Seams and corners (check approved connections).
- Penetrations — Valve and other openings (specify seals).
- Receptor — Base and drain interface (document before covering).
Ask the contractor to name the system
The proposal should specify the receptor, wall substrate, waterproof layer, drain connection, seams, corners and seals around penetrations. Ask which manufacturer instructions apply to the components used together. If a bid only names tile and grout, request a separate description of the assembly behind them.
Mark the interfaces on a simple sketch
In an illustrative 60 × 30 in. alcove with three tiled sides, mark both back corners, where the walls meet the base, the drain connection and each opening for plumbing. The drawing tells you what to photograph and inspect. Niche corners, benches and an entry or curb need their own details when present.
| Line item | Value | Basis |
|---|---|---|
| Walls | Seams and corners | Check approved connections |
| Penetrations | Valve and other openings | Specify seals |
| Receptor | Base and drain interface | Document before covering |

Compare the curing schedule with the test
Ask the installer which water test applies to the selected system and who schedules it. Confirm the period before the test and any local inspection timing before tile is installed. Schluter publishes a water-test procedure for its own shower system. Use it only with the appropriate product instructions and site process.
Schluter shower system water test · Manufacturer instructions for its particular shower system.
Waterproofing questions and inspection checklist
Get a print-ready planning worksheet by email. We use your name and email to fulfill your request, not to sign you up for marketing.
Put hidden-work acceptance in the quote
Agree who documents the installed details and when you can review them. Check the shower system comparison against the identified receptor and enclosure, then write down how a test issue or substrate repair would be resolved and priced before the work proceeds.
- Product assembly — List base, drain, wall substrate and waterproof layer.
- Detail review — Record seams, niches, penetrations and threshold.
- Test schedule — Record installer procedure and inspection timing.
- Documentation — Name the person who records photos and sign-off.

Sources and scope notes
We distinguish published references from worked scenarios, which are not verified contractor bids. Review product instructions and local requirements for your own project.
- Schluter shower system water testManufacturer instructions for its particular shower system.
- Tile Council of North America installation FAQIndustry guidance on installation details and tile layout considerations.
- FTC home improvement hiring guidanceGuidance on written estimates, hiring and contracts.